WL Vega Life Sciences Private Limited MARCS - JUNE 17, 2020


3. Failure to exercise sufficient controls over computerized systems to prevent unauthorized access or changes to data and failure to have adequate controls to prevent omission of data.
Your firm failed to implement adequate controls to ensure the integrity of data generated at your facility including:
Missing raw data files associated with recovered solvent testing were observed in folders on the local hard drive of the operating system connected to the GC instrument. Your firm indicated that the files appear to have been deleted.
• Quality Control analysts shared the same username and password for the operating system on each workstation and the analytical software for the GC.
• Recovered solvent data on the stand-alone computerized system for the GC were not backed up as required per your approved procedure.
• Your firm did not have a procedure governing the audit trail or its retention. During the inspection, the GC analytical software was configured to retain the audit trail for only (b)(4).
Your firm failed to include a comprehensive, systematic plan for evaluating your practices and procedures to ensure data integrity controls are applied throughout your firm. Additionally, you failed to conduct a risk assessment addressing potential impacts to product as a result of the inadequate data integrity controls.

Posts les plus consultés de ce blog

On déménage...

USA : un site destiné à gérer la distribution des vaccins contre la Covid-19 de 44 millions $ construit par Deloitte abandonné à cause des bogues informatiques