Une Warning Letter repose la question du choix des fournisseurs

Cette mise en demeure s'adresse à une société fabricante de dispositif médical et lui reproche (entre autres) de ne pas avoir évalué et sélectionné correctement certains de ses fournisseurs :
5.    Failure to adequately evaluate and select potential suppliers, contractors, and consultants on the basis of their ability to meet specified requirements, including quality requirements, as required by 21 CFR 820.50(a)(1). For example,
a.    Your firm has not evaluated and selected the suppliers for the components used in the manufacture of the ANSR: BEAM and ANSR: HALO devices on the basis of their ability to meet specified requirements, including quality requirements.

 b.    Your firm has not evaluated and selected the contract manufacturers for the ANSR: BEAM and ANSR: HALO devices on the basis of their ability to meet specified requirements, including quality requirements.
Nous aurons l'occasion de revenir prochainement sur ce sujet.

Posts les plus consultés de ce blog

On déménage...

USA : un site destiné à gérer la distribution des vaccins contre la Covid-19 de 44 millions $ construit par Deloitte abandonné à cause des bogues informatiques